South Commons
Parking Garages
Chicago, Illinois
SEE performed
a structural evaluation of two parking garages at South Commons. Both parking
garages are reinforced concrete structures. One has two levels with a total of
45,000 square feet of parking space, the other has three levels with a total of
105,000 square feet of parking space. SEE
submitted a comprehensive investigative report that
included our findings, conclusions, recommendations and construction cost
estimates. Our client authorized SEE
to monitor the parking garages until funds become available to repair them.
Wheaton Center
Evaluation of Parking Garages
Wheaton, Illinois
SEE performed
a structural evaluation of three parking garages at the Wheaton Center. Total
parking space for all three garages is approximately 270,000 square feet and
total car capacity of 900. SEE
performed a condition assessment, field and laboratory
testing, structural analysis and prepared a comprehensive investigative report.
The report addressed the problems and deficiencies associated with each parking
garage and presented recommendations with cost estimates. The parking garages
exhibited severe serviceability problems. A portion of one parking garage needed
to be closed and shored until the necessary repairs were performed. At the
request of our client, SEE
prepared bid documents for phase-1 of the rehabilitation and provided field
engineering services during construction.
West Suburban Hospital
Parking Garage
Oak Park, Illinois
SEE was hired
to evaluate the existing condition of the post-tensioned tendons in the parking
garage structure. The parking garage has four levels with a total of 240,000
square feet of parking space and total car capacity of 800.
SEE reviewed six
observation pits at the top of the floors and eight observation pits at the
underside of the floor slabs to determine the corrosion protection system and
evaluate the extent of deterioration. A comprehensive evaluation report was
issued which included findings, conclusions, recommendations, and construction
cost estimates. Next SEE
prepared a complete set of bidding documents including drawings and
specifications regarding the repairs required. Since substantial concrete
repairs were required, SEE
carefully highlighted areas where extra care was required around post tensioning
cables and anchorages. SEE
also performed contract administration and field engineering services throughout
the phased repair program which included the replacement of up to 274 post
tensioning cables.
City of Aurora
Police Station Parking Deck
Aurora, Illinois
SEE
investigated Aurora Police Station Parking deck and prepared an investigative
report. The report addressed why one year old repair patches were failing and
recommended a repair program for the single tee post-tensioned slab.
SEE engineered an
innovative repair approach which allowed the installation of new slab tendons
without replacing the slab. The city authorized
SEE to prepare bid
documents for all required repairs, waterproofing protection, upgrading lighting
system and signage for the deck. SEE
provided contract administration and oversaw construction work.
2020 Lincoln Park West
Rehabilitation of Recreation Deck
Chicago, Illinois
2020 Lincoln Park West Condominium Association contacted
SEE when their
recreation deck over parking garage was in need of rehabilitation.
SEE performed an
evaluation and determined that the tennis court playing surface, various
waterproofing membranes on the entire deck, and tennis court lighting system had
all reached the end of their useful life. Additionally, the perimeter fence
supports around the tennis court had been bent out of alignment due to severe
wind loads and under-strength connections.
SEE prepared repair drawings and
specifications to correct all of the problems associated with the deck including
concrete repairs. Four tennis court covering options were specified as well as
an entire new lighting system which was upgradeable for higher light intensity
in the future. SEE
also performed field engineering services during construction on behalf of the
Condominium Association.
Wheaton Center
Feasibility Study
Wheaton, Illinois
SEE was
retained to study the feasibility of converting the roof deck of the parking
garage to additional parking space. The roof deck is approximately 36,000 square
feet. We reviewed the available documents, performed a condition survey, studied
a possible access ramp location and site conditions, performed structural
calculations to determine the load carrying capacity of the roof deck, studied
different parking layouts in order to maximize car space, and analyzed different
construction techniques for the substructure and superstructure of the access
ramp. A comprehensive feasibility report was issued that included the results of
our study, recommendations, cost estimate, and parking layout drawing along with
the proposed access ramp. One external access ramp and one internal access ramp
were proposed and presented to our client to review and select.
2020 Lincoln Park West Condominium Association
Evaluation and Rehabilitation of Expansion Joint
Chicago, Illinois
Structure Evaluation Engineers, Inc.
was retained to evaluate and rehabilitate the expansion joint between the
parking deck and building. Concrete spalling along the joint was observed and
was determined that the original design did not include adequate provision for
sliding. Concrete spalling was so severe that the parking deck was shored along
the joint until proper repairs were performed.
SEE prepared repair details that allow movement
via sliding bearing plates and brackets. SEE
provided contract administration and oversaw the construction work.
The Salvation Army
Plaza Deck Rehabilitation
Des Plaines, Illinois
Structure Evaluation Engineers, Inc.
was retained to evaluate plaza deck water infiltration at the Salvation Army
Headquarters. Water was infiltrating through the plaza deck and underground
tunnel between buildings. Previous repairs (i.e. epoxy injection) proved to be
ineffective in stopping water leaks. The plaza deck consisted of 6-inch
structural slab, buried waterproofing membrane, and exposed aggregate topping
over occupied areas. The underground tunnel had the same waterproofing system as
the plaza deck but four feet below a landscaped area.
SEE prepared a
comprehensive report that addressed the cause of water infiltration and provided
two repair options with estimated construction cost. Our client chose a repair
option which consisted of removing completely the existing system and replacing
it with a new system that included architectural pavers.
SEE prepared complete repair documents, obtained
bids from contractors, and provided construction management services for the
project. The actual construction cost was less than estimated cost by about one
percent (1.0%).
Best Group, Inc.
Bridge No. 86-6 Inspection
Joliet, Illinois
When the Forest Service closed Bridge No. 86-6 due to concerns regarding
deterioration, The Best Group, Inc. retained
SEE to perform a bridge
inspection. SEE
reviewed previous repair information and visually evaluated all visible
components of the bridge. Our evaluation followed the latest edition of the
Illinois Department of Transportation (IDOT) Bridge Inspection Report which
provided our client with overall condition ratings for major categories of
bridge components (i.e. bridge deck, railings, superstructure, paint,
substructure, channel and abutment protection, and waterway) as well as specific
element ratings for every single element of the bridge. Our final report
included the completed IDOT Bridge Inspection Report, a plan view and typical
cross section of the bridge, representative photos, conclusions, and
recommendations sections that prioritized all recommended repairs. At the
request of the Best Group, Inc., SEE also designed, prepared repair documents,
and performed field engineering services for repairs which had to be done prior
to reopening the bridge to traffic.
Zera Construction Company, Inc.
Shoring Design for O’Hare Plaza I
Chicago, Illinois
Structure Evaluation Engineers, Inc.
was retained to design shoring for the O’Hare Plaza I
South and West Driveway parking garage rehabilitation.
SEE briefly reviewed
construction documents and designed a shoring scheme that not only allowed
performing concrete repairs to the parking deck effectively, but was also the
most cost-effective shoring plan.